That is the sound of excitement pulsating through my veins! I just called into our contractor and ordered the new bathtub, toilet and accessories. Ahhhh!!!! The contract has an opening for February 23rd or 27th to start work but I don't know if we'll get everything lined up in time. Either way, each day we get closer to having a shower upstairs!!! I cannot wait for the bathroom remodel. It is going to be so beautiful!!
We are refinishing the hardwood floors in the bathroom, installing subway tile halfway up the walls, installing a new tub and shower and new toilet. Matt and I are going to paint the built-ins and vanity. We are keeping the old sink and we are also tiling the entire inside of the shower. Oh, and because we don't have a third wall to build in the tub and shower the contractor is going to build a partial wall at the end of the tub and then install glass all the way to the ceiling. It is going to be amazing!!!! Instead of a shower door we are going to put in a track shower curtain. The track is installed on the ceiling and the curtain will hang from ceiling to floor. It will be very dramatic! Now I just need to find material to sew a super cool shower curtain.
Oh, and we also need to make some repairs to the bathroom door since it currently has no handle. We'll probably try to install one that fits with the era of the house and of course repaint the inside of the door. I am so excited!!!!!!! I'll keep you posted...
We are refinishing the hardwood floors in the bathroom, installing subway tile halfway up the walls, installing a new tub and shower and new toilet. Matt and I are going to paint the built-ins and vanity. We are keeping the old sink and we are also tiling the entire inside of the shower. Oh, and because we don't have a third wall to build in the tub and shower the contractor is going to build a partial wall at the end of the tub and then install glass all the way to the ceiling. It is going to be amazing!!!! Instead of a shower door we are going to put in a track shower curtain. The track is installed on the ceiling and the curtain will hang from ceiling to floor. It will be very dramatic! Now I just need to find material to sew a super cool shower curtain.
Oh, and we also need to make some repairs to the bathroom door since it currently has no handle. We'll probably try to install one that fits with the era of the house and of course repaint the inside of the door. I am so excited!!!!!!! I'll keep you posted...